    Your Forecast Assumes People Are Perfect

    Your Forecast Assumes People Are Perfect

    Look at almost any project forecast and you'll find the same assumption sitting behind the numbers.

    project management
    forecasting
    business strategy
    productivity
    SME

    Look at almost any project forecast and you'll find the same assumption sitting behind the numbers.

    Every person works at full capacity, every day. Nobody gets sick, nobody gets roped into a new task they hadn’t planned for. 

    The integration that broke last Thursday gets fixed in the same hour it was noticed, by the same person who built it, who also happens to have nothing else on. 

    The handover between marketing and dev takes the half-day the Gantt chart says it takes, not the three days it actually takes because someone is waiting on a Slack reply from someone else who’s at a conference. 

    If you ran your forecast against the team you have, instead of the team the spreadsheet assumes you have, the numbers would look very different.

    The forecast was just built for a version of the team that doesn't exist.

    Where the assumption gets baked in

    The assumption usually enters the model in three places, and it almost never enters as a decision someone consciously made.

    • The first place is utilisation.
      Most forecasts assume something close to 100% billable or productive time, sometimes marked at 85% or 90% to feel more realistic. In practice, anyone who has actually measured this in any SME knows the figure sits closer to 60-70% once you account for internal meetings, admin, handovers, context-switching, training, and the work that gets redone because the brief changed.
      The forecast doesn't account for any of that, which means it's already 20-30% overcommitted before a single project starts.

    • The second place is sequencing.
      Forecasts model work as if tasks happen in the order they're listed. Reality is that two of those tasks are blocked, one is waiting for client input, and the project manager is spending Tuesday morning figuring out which of those problems to solve first. The work hasn't stopped, it's just not in the order the plan said it would be in.
      The forecast still shows everything on track, because the forecast can't see sequence drift.

    • The third place is the buffer that isn't there.
      Plans get built to the optimistic case because that's the case that wins the budget approval. Nobody adds a fortnight for "the inevitable thing we haven't thought of yet" because then the project looks slower and more expensive than the competing proposal. So the buffer gets stripped out at the planning stage, and then reappears as overrun at the delivery stage, by which point it's a problem instead of a plan.

    What this costs

    The cost is usually a slow, gradual erosion that happens when every forecast in the business is running on the same flawed assumption.

    It's the project that was delivered six weeks late, which everyone explained away as "scope creep".

    It's the team that's been working extra hours most weeks to keep the delivery date intact, which is fine until the third person resigns because of burnout. 

    And it's the reporting problem this creates upstream. When a CEO or board asks "are we on track?", the honest answer requires acknowledging that the forecast was always optimistic. Most operational reporting doesn't allow that conversation to happen, because the green/amber/red traffic-light view assumes the original forecast was a fair benchmark to measure against. It usually wasn't.

    What a realistic forecast looks like

    Capacity gets modelled at the level it's realistically available. For a typical SME team this usually means planning at 65-75% of theoretical capacity. This change alone closes most of the gap. 

    Most forecasts treat dependencies as fixed points. In practice they're often the biggest source of slippage, because the moment one piece moves, every downstream piece needs replanning.

    A realistic forecast includes the time you know you'll need for the things you can't yet name. Calling it "contingency" or "discovery" or "iteration time" is fine. Pretending it doesn't exist is what contributes to the gap.

    By mid-quarter you usually have enough information to know which assumptions held and which didn't. A realistic forecasting process treats data as the most valuable input it gets all quarter. An optimistic one treats it as a threat to the original plan.

    What the last five months already told you

    It's late May, and most SMEs are sitting with a Q1 that’s already told them where the gap is. 

    The choice between now and the end of the quarter is either to recalibrate against what the last five months told you, or to keep running the original forecast and absorb the variance. 

    Your forecast doesn't need to be perfect. It needs to be honest about the team it's planning for.

    If you've got the gap between forecast and reality in your operational reporting and you can't quite see where it's coming from, that's the conversation mutherboard exists for. We work with SMEs to build the visibility layer that makes the gap measurable, so the next forecast doesn't repeat the last one.


    Ready to Implement These Solutions?

    Let our experts help you apply these insights to your business operations.

    Chew On This - Your Weekly Bite of Tech & AI News

    Your Weekly Bite of Tech & AI News

    Get the latest insights on business automation, AI trends, and industry developments delivered straight to your inbox every week.

    No spam, ever. Unsubscribe at any time. We respect your privacy.